Accredited service provider work · Sydney metro

Level 2 Electrician Sydney

Point-of-supply work sits outside a standard electrical licence. Connections, consumer mains, metering and defect notices on the network side need a Level 2 accredited service provider. Tell us about the job and get a properly scoped quote for the network-side work.

Level 2 services

Network-side work, properly scoped

Network coverage

Ausgrid, Endeavour and Essential Energy

Level 2 processes differ by distribution network. Find yours below, it is printed on your electricity bill.

How it works

From enquiry to closed paperwork

  1. 01

    Describe the job

    The service type, the network area, any defect notice reference and photos of the switchboard, meter panel and service route give enough to scope most work accurately.

  2. 02

    Get a scoped quote

    The quote separates network-side Level 2 work from any installation-side electrical work, states assumptions, and lists network fees and notification steps.

  3. 03

    Network coordination

    Connection applications, outage notifications and metering-coordinator bookings run against the network's process before crews attend.

  4. 04

    Completion and paperwork

    Finished work is notified to the network with compliance documentation, closing any defect notice and updating network records.

Straight answers

Level 2 questions

What is a Level 2 electrician?

An electrician working for an accredited service provider (ASP) authorised under the NSW ASP scheme to work on the service equipment between the electricity network and a property's main switch: overhead and underground services, consumer mains, metering and disconnection work that a standard electrical licence does not cover.

Do I need Level 2 or a regular electrician?

If the job touches the service line, point of attachment, consumer mains, meter or the network connection itself, it is Level 2 work. Wiring past the main switch (power points, lighting, circuits) is standard licensed electrical work. Many projects need both, sequenced together.

I received a defect notice. How urgent is it?

Treat the printed rectification date as firm. Networks can disconnect supply where notices lapse, and re-energisation adds cost and delay. Early assessment also preserves the option of bundling rectification with other planned work.

Which network am I on?

Broadly: Ausgrid covers inner Sydney, the east, North Shore and Central Coast; Endeavour Energy covers the west, southwest, Blue Mountains and Illawarra; Essential Energy covers the rural fringe and regional NSW. Your electricity distributor is printed on your bill.

Does a three-phase upgrade need network approval?

Yes. A connection application to your network business establishes what the local infrastructure can supply. The physical works (service, consumer mains and metering) follow the approved connection offer.

Can you work with my builder or electrician?

Level 2 scope is routinely sequenced around builders, demolition contractors, solar installers and licensed electricians. Disconnections, temporary supplies and reconnections are programmed to match the site schedule.

Never touch fallen service lines, exposed conductors or damaged network equipment. Keep people clear and report life-threatening electrical hazards to the network operator or emergency services immediately.

Level 2 services

Tell us about the job

Send through the job details and we'll connect you with a licensed provider who can quote this work.

If this is an emergency or anyone is at immediate risk, contact the relevant emergency service or your network or utility operator directly instead of using this form.